| Orange County — 6,019 units authorized in 12 months |
|---|
| Irvine | Orange | 1,678 | 549 | 1,129 | How to apply |
How to apply in Irvine
Most jobs with plans are submitted through the city's Irvine Ready! electronic plan system. Some minor residential or solar work may follow a same-day or minor-permit path instead of a full plan check. After fees are paid, inspections are scheduled until final approval. Requirements change; confirm with the city.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| Tustin | Orange | 806 | 8 | 798 | Confirm with the local building department |
| Orange County Unincorporated Area | Orange | 528 | 449 | 79 | How to apply |
How to apply in Orange County Unincorporated Area
For unincorporated Orange County, create an account on myOCeServices, choose a private-property permit application, and upload plans as requested. The county runs plan check, collects fees, and inspections are scheduled until a final sign-off. Requirements change; confirm with the county.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| Garden Grove | Orange | 424 | 341 | 83 | Confirm with the local building department |
| Huntington Beach | Orange | 417 | 219 | 198 | Confirm with the local building department |
| Santa Ana | Orange | 401 | 225 | 176 | Confirm with the local building department |
| Brea | Orange | 392 | 1 | 391 | Confirm with the local building department |
| Fullerton | Orange | 210 | 198 | 12 | Confirm with the local building department |
| Anaheim | Orange | 201 | 109 | 92 | How to apply |
How to apply in Anaheim
Jobs that need plans are submitted through the city's Building Division electronic plan-review portal. After you upload the application and plans, the city invoices fees and then routes the job for plan check. Some small residential solar, EV charger, and panel-upgrade jobs can use the online permit center instead of a full plan submittal. Inspections are requested after the permit is issued, through final approval. Requirements change; confirm with the city.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| Newport Beach | Orange | 159 | 105 | 54 | How to apply |
How to apply in Newport Beach
Use the city's Building Division pages to start a permit, submit plans for plan check when needed, and pay fees. Inspections are scheduled after issuance, through final approval. Requirements change; confirm with the city.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| Orange | Orange | 116 | 99 | 17 | Confirm with the local building department |
| Buena Park | Orange | 105 | 46 | 59 | Confirm with the local building department |
| Yorba Linda | Orange | 101 | 37 | 64 | How to apply |
How to apply in Yorba Linda
Apply through the official city or county building-permit page or portal. Typical steps are to submit an application and plans, complete plan check, pay fees, schedule inspections, and obtain a final sign-off. Requirements change; confirm with the city or county.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| Fountain Valley | Orange | 77 | 77 | 0 | Confirm with the local building department |
| Westminster | Orange | 75 | 58 | 17 | Confirm with the local building department |
| Laguna Beach | Orange | 49 | 49 | 0 | Confirm with the local building department |
| La Habra | Orange | 48 | 44 | 4 | Confirm with the local building department |
| Placentia | Orange | 39 | 39 | 0 | Confirm with the local building department |
| Cypress | Orange | 32 | 32 | 0 | Confirm with the local building department |
| Lake Forest | Orange | 30 | 30 | 0 | Confirm with the local building department |
| San Clemente | Orange | 23 | 23 | 0 | How to apply |
How to apply in San Clemente
Apply through the official city or county building-permit page or portal. Typical steps are to submit an application and plans, complete plan check, pay fees, schedule inspections, and obtain a final sign-off. Requirements change; confirm with the city or county.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| Dana Point | Orange | 22 | 22 | 0 | How to apply |
How to apply in Dana Point
Apply through the official city or county building-permit page or portal. Typical steps are to submit an application and plans, complete plan check, pay fees, schedule inspections, and obtain a final sign-off. Requirements change; confirm with the city or county.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| San Juan Capistrano | Orange | 20 | 20 | 0 | Confirm with the local building department |
| Laguna Niguel | Orange | 16 | 16 | 0 | Confirm with the local building department |
| Villa Park | Orange | 10 | 10 | 0 | Confirm with the local building department |
| Mission Viejo | Orange | 9 | 9 | 0 | Confirm with the local building department |
| Seal Beach | Orange | 9 | 9 | 0 | How to apply |
How to apply in Seal Beach
Apply through the official city or county building-permit page or portal. Typical steps are to submit an application and plans, complete plan check, pay fees, schedule inspections, and obtain a final sign-off. Requirements change; confirm with the city or county.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| Laguna Hills | Orange | 8 | 8 | 0 | How to apply |
How to apply in Laguna Hills
Apply through the official city or county building-permit page or portal. Typical steps are to submit an application and plans, complete plan check, pay fees, schedule inspections, and obtain a final sign-off. Requirements change; confirm with the city or county.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| Stanton | Orange | 8 | 4 | 4 | Confirm with the local building department |
| Costa Mesa | Orange | 4 | 4 | 0 | Confirm with the local building department |
| La Palma | Orange | 2 | 2 | 0 | Confirm with the local building department |
| Aliso Viejo | Orange | 0 | 0 | 0 | Confirm with the local building department |
| Laguna Woods | Orange | 0 | 0 | 0 | How to apply |
How to apply in Laguna Woods
Apply through the official city or county building-permit page or portal. Typical steps are to submit an application and plans, complete plan check, pay fees, schedule inspections, and obtain a final sign-off. Requirements change; confirm with the city or county.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| Los Alamitos | Orange | 0 | 0 | 0 | Confirm with the local building department |
| Rancho Santa Margarita | Orange | 0 | 0 | 0 | Confirm with the local building department |
| Los Angeles County — 29,420 units authorized in 12 months |
|---|
| Los Angeles | Los Angeles | 18,596 | 4,325 | 14,271 | How to apply |
How to apply in Los Angeles
Start at the city's building and safety site. Many jobs with plans go through electronic plan submittal; some small projects can use the express online permit path instead of a full plan check. After fees are paid, inspections are requested through the city's online services until a final sign-off. Requirements change; confirm with the city.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| Los Angeles County Unincorporated Area | Los Angeles | 2,147 | 992 | 1,155 | How to apply |
How to apply in Los Angeles County Unincorporated Area
For unincorporated areas, apply through the county's EPIC-LA portal. Submit plans for plan check when the job requires them, pay invoiced fees, then schedule inspections in the same system through the final inspection. Requirements change; confirm with the county.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| Santa Monica | Los Angeles | 837 | 75 | 762 | How to apply |
How to apply in Santa Monica
Create an application in the city's permitting portal and upload plans for review when required. Fees are paid and inspections are scheduled through the city's online services until a final sign-off. Some very small jobs may follow an express path. Requirements change; confirm with the city.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| Long Beach | Los Angeles | 583 | 165 | 418 | How to apply |
How to apply in Long Beach
Start at the city's Building and Safety pages to apply online, submit plans for review when required, and pay fees. Inspections are requested through the city's permit services until a final sign-off. Requirements change; confirm with the city.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| Arcadia | Los Angeles | 580 | 74 | 506 | How to apply |
How to apply in Arcadia
Apply through the official city or county building-permit page or portal. Typical steps are to submit an application and plans, complete plan check, pay fees, schedule inspections, and obtain a final sign-off. Requirements change; confirm with the city or county.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| Palmdale | Los Angeles | 508 | 215 | 293 | Confirm with the local building department |
| Pasadena | Los Angeles | 427 | 110 | 317 | How to apply |
How to apply in Pasadena
Start at the city's Permit Center to apply, submit plans for plan check, and pay fees. Inspections are scheduled after the permit is issued, through final approval. Requirements change; confirm with the city.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| Santa Clarita | Los Angeles | 377 | 243 | 134 | How to apply |
How to apply in Santa Clarita
Apply through the official city or county building-permit page or portal. Typical steps are to submit an application and plans, complete plan check, pay fees, schedule inspections, and obtain a final sign-off. Requirements change; confirm with the city or county.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| Rosemead | Los Angeles | 337 | 228 | 109 | Confirm with the local building department |
| Inglewood | Los Angeles | 310 | 126 | 184 | Confirm with the local building department |
| Pomona | Los Angeles | 302 | 201 | 101 | Confirm with the local building department |
| Glendale | Los Angeles | 292 | 116 | 176 | Confirm with the local building department |
| Lancaster | Los Angeles | 236 | 99 | 137 | Confirm with the local building department |
| Culver City | Los Angeles | 201 | 96 | 105 | Confirm with the local building department |
| West Hollywood | Los Angeles | 191 | 3 | 188 | Confirm with the local building department |
| El Monte | Los Angeles | 180 | 89 | 91 | Confirm with the local building department |
| Downey | Los Angeles | 152 | 148 | 4 | Confirm with the local building department |
| South Gate | Los Angeles | 147 | 147 | 0 | Confirm with the local building department |
| Compton | Los Angeles | 139 | 98 | 41 | Confirm with the local building department |
| Montebello | Los Angeles | 139 | 41 | 98 | Confirm with the local building department |
| Pico Rivera | Los Angeles | 135 | 135 | 0 | How to apply |
How to apply in Pico Rivera
Apply through the official city or county building-permit page or portal. Typical steps are to submit an application and plans, complete plan check, pay fees, schedule inspections, and obtain a final sign-off. Requirements change; confirm with the city or county.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| Temple City | Los Angeles | 133 | 115 | 18 | How to apply |
How to apply in Temple City
Apply through the official city or county building-permit page or portal. Typical steps are to submit an application and plans, complete plan check, pay fees, schedule inspections, and obtain a final sign-off. Requirements change; confirm with the city or county.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| Covina | Los Angeles | 124 | 73 | 51 | How to apply |
How to apply in Covina
Apply through the official city or county building-permit page or portal. Typical steps are to submit an application and plans, complete plan check, pay fees, schedule inspections, and obtain a final sign-off. Requirements change; confirm with the city or county.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| Alhambra | Los Angeles | 113 | 113 | 0 | Confirm with the local building department |
| Glendora | Los Angeles | 113 | 88 | 25 | How to apply |
How to apply in Glendora
Apply through the official city or county building-permit page or portal. Typical steps are to submit an application and plans, complete plan check, pay fees, schedule inspections, and obtain a final sign-off. Requirements change; confirm with the city or county.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| La Mirada | Los Angeles | 110 | 110 | 0 | Confirm with the local building department |
| Walnut | Los Angeles | 108 | 68 | 40 | Confirm with the local building department |
| Redondo Beach | Los Angeles | 105 | 105 | 0 | How to apply |
How to apply in Redondo Beach
Apply through the official city or county building-permit page or portal. Typical steps are to submit an application and plans, complete plan check, pay fees, schedule inspections, and obtain a final sign-off. Requirements change; confirm with the city or county.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| Manhattan Beach | Los Angeles | 93 | 82 | 11 | Confirm with the local building department |
| Burbank | Los Angeles | 92 | 47 | 45 | How to apply |
How to apply in Burbank
Apply through the official city or county building-permit page or portal. Typical steps are to submit an application and plans, complete plan check, pay fees, schedule inspections, and obtain a final sign-off. Requirements change; confirm with the city or county.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| Lakewood | Los Angeles | 91 | 59 | 32 | How to apply |
How to apply in Lakewood
Apply through the official city or county building-permit page or portal. Typical steps are to submit an application and plans, complete plan check, pay fees, schedule inspections, and obtain a final sign-off. Requirements change; confirm with the city or county.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| West Covina | Los Angeles | 88 | 88 | 0 | Confirm with the local building department |
| Whittier | Los Angeles | 88 | 88 | 0 | Confirm with the local building department |
| Bellflower | Los Angeles | 85 | 70 | 15 | Confirm with the local building department |
| Bell Gardens | Los Angeles | 68 | 23 | 45 | Confirm with the local building department |
| Baldwin Park | Los Angeles | 66 | 62 | 4 | Confirm with the local building department |
| Monterey Park | Los Angeles | 66 | 60 | 6 | How to apply |
How to apply in Monterey Park
Apply through the official city or county building-permit page or portal. Typical steps are to submit an application and plans, complete plan check, pay fees, schedule inspections, and obtain a final sign-off. Requirements change; confirm with the city or county.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| San Gabriel | Los Angeles | 65 | 55 | 10 | Confirm with the local building department |
| Diamond Bar | Los Angeles | 63 | 63 | 0 | Confirm with the local building department |
| Lynwood | Los Angeles | 60 | 60 | 0 | Confirm with the local building department |
| Monrovia | Los Angeles | 57 | 57 | 0 | Confirm with the local building department |
| Malibu | Los Angeles | 56 | 56 | 0 | Confirm with the local building department |
| San Marino | Los Angeles | 48 | 25 | 23 | Confirm with the local building department |
| Norwalk | Los Angeles | 44 | 44 | 0 | Confirm with the local building department |
| El Segundo | Los Angeles | 42 | 29 | 13 | Confirm with the local building department |
| Paramount | Los Angeles | 42 | 42 | 0 | Confirm with the local building department |
| San Fernando | Los Angeles | 39 | 33 | 6 | Confirm with the local building department |
| Vernon | Los Angeles | 38 | 0 | 38 | Confirm with the local building department |
| Torrance | Los Angeles | 35 | 31 | 4 | Confirm with the local building department |
| Beverly Hills | Los Angeles | 34 | 23 | 11 | Confirm with the local building department |
| Artesia | Los Angeles | 31 | 31 | 0 | Confirm with the local building department |
| Hermosa Beach | Los Angeles | 31 | 29 | 2 | Confirm with the local building department |
| South Pasadena | Los Angeles | 31 | 31 | 0 | Confirm with the local building department |
| Lawndale | Los Angeles | 29 | 18 | 11 | Confirm with the local building department |
| Duarte | Los Angeles | 23 | 23 | 0 | Confirm with the local building department |
| Gardena | Los Angeles | 21 | 21 | 0 | Confirm with the local building department |
| Santa Fe Springs | Los Angeles | 21 | 21 | 0 | Confirm with the local building department |
| Hawthorne | Los Angeles | 19 | 19 | 0 | Confirm with the local building department |
| La Canada Flintridge | Los Angeles | 19 | 19 | 0 | Confirm with the local building department |
| San Dimas | Los Angeles | 17 | 17 | 0 | Confirm with the local building department |
| Carson | Los Angeles | 16 | 3 | 13 | Confirm with the local building department |
| Palos Verdes Estates | Los Angeles | 16 | 16 | 0 | Confirm with the local building department |
| Maywood | Los Angeles | 15 | 7 | 8 | Confirm with the local building department |
| Rancho Palos Verdes | Los Angeles | 15 | 15 | 0 | Confirm with the local building department |
| Hawaiian Gardens | Los Angeles | 13 | 13 | 0 | Confirm with the local building department |
| Lomita | Los Angeles | 13 | 13 | 0 | Confirm with the local building department |
| Bell | Los Angeles | 10 | 10 | 0 | Confirm with the local building department |
| La Puente | Los Angeles | 10 | 10 | 0 | Confirm with the local building department |
| Sierra Madre | Los Angeles | 10 | 10 | 0 | Confirm with the local building department |
| Hidden Hills | Los Angeles | 9 | 9 | 0 | Confirm with the local building department |
| Signal Hill | Los Angeles | 9 | 9 | 0 | Confirm with the local building department |
| Claremont | Los Angeles | 8 | 8 | 0 | Confirm with the local building department |
| Commerce | Los Angeles | 8 | 8 | 0 | Confirm with the local building department |
| South El Monte | Los Angeles | 8 | 8 | 0 | Confirm with the local building department |
| Agoura Hills | Los Angeles | 6 | 6 | 0 | Confirm with the local building department |
| Bradbury | Los Angeles | 6 | 0 | 6 | Confirm with the local building department |
| Azusa | Los Angeles | 4 | 4 | 0 | Confirm with the local building department |
| Calabasas | Los Angeles | 4 | 4 | 0 | Confirm with the local building department |
| La Habra Heights | Los Angeles | 4 | 4 | 0 | Confirm with the local building department |
| Huntington Park | Los Angeles | 3 | 3 | 0 | Confirm with the local building department |
| La Verne | Los Angeles | 3 | 3 | 0 | Confirm with the local building department |
| Cudahy | Los Angeles | 2 | 0 | 2 | Confirm with the local building department |
| Irwindale | Los Angeles | 1 | 1 | 0 | Confirm with the local building department |
| Rolling Hills | Los Angeles | 1 | 1 | 0 | Confirm with the local building department |
| Rolling Hills Estates | Los Angeles | 1 | 1 | 0 | Confirm with the local building department |
| Westlake Village | Los Angeles | 1 | 1 | 0 | Confirm with the local building department |
| Avalon | Los Angeles | 0 | 0 | 0 | Confirm with the local building department |
| Cerritos | Los Angeles | 0 | 0 | 0 | Confirm with the local building department |
| Industry | Los Angeles | 0 | 0 | 0 | Confirm with the local building department |
| Riverside County — 7,419 units authorized in 12 months |
|---|
| Riverside County Unincorporated Area | Riverside | 1,119 | 1,119 | 0 | How to apply |
How to apply in Riverside County Unincorporated Area
For unincorporated Riverside County, register and apply through the county's PLUS Online system, linked from the Building and Safety online-submittal page. Upload plans and the application, then the county invoices fees and continues through plan check and inspections to a final sign-off. Some solar jobs can be started as a specific permit type in the same portal. Requirements change; confirm with the county.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| Menifee | Riverside | 716 | 687 | 29 | Confirm with the local building department |
| Riverside | Riverside | 526 | 261 | 265 | How to apply |
How to apply in Riverside
Apply through the city's public permit portal linked from Building and Safety. Submit plans for plan check when required, pay fees, and schedule inspections until the work is signed off. Requirements change; confirm with the city.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| Indio | Riverside | 441 | 291 | 150 | Confirm with the local building department |
| Palm Desert | Riverside | 424 | 126 | 298 | Confirm with the local building department |
| Hemet | Riverside | 376 | 376 | 0 | Confirm with the local building department |
| Banning | Riverside | 369 | 369 | 0 | Confirm with the local building department |
| Moreno Valley | Riverside | 309 | 274 | 35 | How to apply |
How to apply in Moreno Valley
The city asks applicants to use its SimpliCITY portal on a computer. Register, start a Building and Safety application, and upload plans as PDFs. Staff review the submittal, fees are paid through the portal, and inspections are requested there through a final inspection. Requirements change; confirm with the city.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| Wildomar | Riverside | 307 | 21 | 286 | Confirm with the local building department |
| Jurupa Valley | Riverside | 298 | 273 | 25 | How to apply |
How to apply in Jurupa Valley
Apply through the official city or county building-permit page or portal. Typical steps are to submit an application and plans, complete plan check, pay fees, schedule inspections, and obtain a final sign-off. Requirements change; confirm with the city or county.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| Perris | Riverside | 269 | 269 | 0 | Confirm with the local building department |
| Temecula | Riverside | 265 | 265 | 0 | Confirm with the local building department |
| San Jacinto | Riverside | 262 | 262 | 0 | Confirm with the local building department |
| Beaumont | Riverside | 251 | 251 | 0 | Confirm with the local building department |
| Corona | Riverside | 224 | 104 | 120 | How to apply |
How to apply in Corona
Apply through the official city or county building-permit page or portal. Typical steps are to submit an application and plans, complete plan check, pay fees, schedule inspections, and obtain a final sign-off. Requirements change; confirm with the city or county.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| Eastvale | Riverside | 218 | 92 | 126 | Confirm with the local building department |
| Lake Elsinore | Riverside | 202 | 202 | 0 | Confirm with the local building department |
| Norco | Riverside | 154 | 25 | 129 | Confirm with the local building department |
| Desert Hot Springs | Riverside | 153 | 136 | 17 | Confirm with the local building department |
| Palm Springs | Riverside | 110 | 85 | 25 | Confirm with the local building department |
| La Quinta | Riverside | 104 | 104 | 0 | Confirm with the local building department |
| Coachella | Riverside | 89 | 36 | 53 | Confirm with the local building department |
| Murrieta | Riverside | 84 | 39 | 45 | Confirm with the local building department |
| Cathedral City | Riverside | 69 | 67 | 2 | Confirm with the local building department |
| Rancho Mirage | Riverside | 58 | 58 | 0 | Confirm with the local building department |
| Calimesa | Riverside | 11 | 11 | 0 | Confirm with the local building department |
| Indian Wells | Riverside | 8 | 8 | 0 | Confirm with the local building department |
| Canyon Lake | Riverside | 3 | 3 | 0 | Confirm with the local building department |
| Blythe | Riverside | 0 | 0 | 0 | How to apply |
How to apply in Blythe
Apply through the official city or county building-permit page or portal. Typical steps are to submit an application and plans, complete plan check, pay fees, schedule inspections, and obtain a final sign-off. Requirements change; confirm with the city or county.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| San Bernardino County — 5,821 units authorized in 12 months |
|---|
| Ontario | San Bernardino | 1,204 | 607 | 597 | Confirm with the local building department |
| Fontana | San Bernardino | 1,198 | 360 | 838 | Confirm with the local building department |
| Montclair | San Bernardino | 524 | 11 | 513 | Confirm with the local building department |
| Highland | San Bernardino | 454 | 160 | 294 | Confirm with the local building department |
| Hesperia | San Bernardino | 362 | 362 | 0 | Confirm with the local building department |
| Redlands | San Bernardino | 337 | 231 | 106 | Confirm with the local building department |
| Rancho Cucamonga | San Bernardino | 304 | 221 | 83 | Confirm with the local building department |
| Victorville | San Bernardino | 300 | 300 | 0 | Confirm with the local building department |
| Chino | San Bernardino | 256 | 226 | 30 | Confirm with the local building department |
| San Bernardino County Unincorporated Area | San Bernardino | 239 | 239 | 0 | Confirm with the local building department |
| San Bernardino | San Bernardino | 100 | 18 | 82 | Confirm with the local building department |
| Loma Linda | San Bernardino | 94 | 94 | 0 | Confirm with the local building department |
| Rialto | San Bernardino | 91 | 91 | 0 | Confirm with the local building department |
| Yucaipa | San Bernardino | 75 | 63 | 12 | Confirm with the local building department |
| Apple Valley town | San Bernardino | 74 | 74 | 0 | Confirm with the local building department |
| Adelanto | San Bernardino | 55 | 55 | 0 | Confirm with the local building department |
| Colton | San Bernardino | 40 | 40 | 0 | Confirm with the local building department |
| Twentynine Palms | San Bernardino | 35 | 27 | 8 | Confirm with the local building department |
| Chino Hills | San Bernardino | 29 | 29 | 0 | Confirm with the local building department |
| Yucca Valley town | San Bernardino | 21 | 21 | 0 | Confirm with the local building department |
| Upland | San Bernardino | 12 | 6 | 6 | Confirm with the local building department |
| Big Bear Lake | San Bernardino | 8 | 8 | 0 | Confirm with the local building department |
| Barstow | San Bernardino | 6 | 6 | 0 | Confirm with the local building department |
| Needles | San Bernardino | 2 | 2 | 0 | Confirm with the local building department |
| Grand Terrace | San Bernardino | 1 | 1 | 0 | Confirm with the local building department |
| San Diego County — 10,466 units authorized in 12 months |
|---|
| San Diego | San Diego | 5,773 | 994 | 4,779 | How to apply |
How to apply in San Diego
Use the city's Development Services permit pages to start an application, upload plans for plan check when required, and pay fees. Inspections are scheduled through the city's permit system after the permit is issued, through final approval. Requirements change; confirm with the city.
These are links to official city or county pages. We do not host or alter application forms. Requirements change; confirm with the city or county.
|
| Chula Vista | San Diego | 1,077 | 64 | 1,013 | Confirm with the local building department |
| Oceanside | San Diego | 705 | 113 | 592 | Confirm with the local building department |
| San Diego County Unincorporated Area | San Diego | 693 | 613 | 80 | Confirm with the local building department |
| Encinitas | San Diego | 427 | 185 | 242 | Confirm with the local building department |
| San Marcos | San Diego | 380 | 282 | 98 | Confirm with the local building department |
| Escondido | San Diego | 262 | 194 | 68 | Confirm with the local building department |
| La Mesa | San Diego | 211 | 106 | 105 | Confirm with the local building department |
| El Cajon | San Diego | 210 | 169 | 41 | Confirm with the local building department |
| Carlsbad | San Diego | 181 | 133 | 48 | Confirm with the local building department |
| Lemon Grove | San Diego | 115 | 36 | 79 | Confirm with the local building department |
| Vista | San Diego | 113 | 105 | 8 | Confirm with the local building department |
| Imperial Beach | San Diego | 105 | 53 | 52 | Confirm with the local building department |
| Poway | San Diego | 90 | 58 | 32 | Confirm with the local building department |
| Santee | San Diego | 55 | 55 | 0 | Confirm with the local building department |
| Coronado | San Diego | 36 | 34 | 2 | Confirm with the local building department |
| Solana Beach | San Diego | 18 | 18 | 0 | Confirm with the local building department |
| Del Mar | San Diego | 13 | 13 | 0 | Confirm with the local building department |
| National City | San Diego | 2 | 2 | 0 | Confirm with the local building department |